Progress of the project in May 2018

Action C.4:

Completion of the fencing construction for the prohibition of vehicles all around the Nevropoli pond. Redesigning the part of the fencing with the additional construction that prevents grazing due to the prolonged stay of the lake waters on a high level, even on May.

Action C.5

Collection of seeds from strobili of Juniperus foetidisima collected from Giona mountain trees.

Action D.1

Field work at the temporary pond of Louka on Mountain Oiti for the monitoring of the vegetation.

Action E.1

Organization of the 2 local events in the framework of the two Environmental Information Centres. The events were organized on 18 and 19 May 2018.